The garage ceiling is now open

A few things needed to happen before we could call the electrician over to add a few outlets:

  1. Clean out the dorm room
  2. Pull the acoustical ceiling tiles down.
  3. Re-arrange the garage a bit
  4. Pull down the sheetrock on a third of the ceiling in there as well.

Since the outlets he’ll be adding required a new circuit (yes – the kitchen runs on two circuits currently.  We NEED another circuit in here), he needs to run the line in the ceiling of those two rooms so he can end up in the kitchen.

We were also supposed to bore holes through those joists so he could fish the lines through easy peasy.  We’re thinking of calling him back for that – it is WAY crowded in those joists already with existing wiring.

The white area on the left is the bottom of our fireplace hearth.  Kinda forgot that would be in the way...

The white area on the left (at the top) is the underside of our fireplace hearth. Kinda forgot that would be in the way...

Either he needs to tell us where he wants them, or we’ll bite the bullet and pay him another 2 hours to do it himself.  Grrrr…

Right now, I’m covered in drywall dust.  My eyelids make noise when I blink.  That can’t be good.

Himself took Herself to the pool to cool off.  I think I’ll hop in the shower and then go take care of the butter emergency we’re having.

Advertisements

2 Comments

Filed under Electrician, Kitchen, Organizing

2 responses to “The garage ceiling is now open

  1. Lola

    Please deal with the butter. Now.

  2. 10thingsatonce

    It is done. Thank you for your support.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s